- At the bid
- Fennec · in pilot with Group Surya
- On site
- Chainage · in trial with Harsh Constructions
- Addressed by
- Chainage, layer and side
- Judged against
- Your specification’s own limits
Illustrative project · 120+000 – 120+480 · 10 m cells
LHS · Dry lean concrete
120+120 – 120+160
Rejected · 40 m
The newest inspection of this ground was rejected, so it stays red. Approvals either side never repaint it; only a newer, approved re-test can.
Inspection 1034raised 19 Jul
Rejected
- Cube compressive strength, 7 day8.6 MPa · limit ≥ 10 MPaFAIL
- Thickness151 mm · limit 150 mm, −0 / +10PASS
Where the paperwork decides the margin.
- 01At the bid
- Requirements are spread across volumes and addenda. A missed clause on eligibility, bid security or liquidated damages costs more than the hours it would have taken to find it.
- Fennec
- 02On site
- Inspection requests, lab results and approvals live in different places. A layer laid over unapproved ground is found late, and the rework is expensive.
- Chainage
- 03At handover and audit
- Proving which stretch was tested, against which limit, and who approved it means reassembling registers after the fact. In Chainage, the record builds itself as the work is approved.
- Chainage
One contractor, two products, four stages.
Step 1: Tender
Load the tender volumes, specifications and schedules into Fennec. Ask about eligibility, securities, penalties and scope, and extract a register in which each line cites its clause.Step 2: Mobilisation
Set up the project in Chainage: the alignment, the pavement layers on each side, structures and drains, and a test catalogue built from the contract’s own acceptance limits.Step 3: Construction
Engineers raise inspection requests by chainage and layer, record the tests, and approvers decide. Chainage refuses to raise a layer over ground that is not ready for it, and names the gap.Step 4: Records
The road board shows the status of every stretch. Reports export to CSV or Excel, and append-only logs keep the history of every inspection.
Road contractor FAQ
Does Chainage follow our contract’s specification?
Yes. The test catalogue holds each test and its acceptance criteria as your contract’s specification writes them, and results are judged against that text rather than a built-in standard.
Can one team use Fennec at the bid and Chainage on site?
Yes, and they are separate products, so you can start with either. Start with whichever problem is closer to its deadline.
Can we report progress to the client from Chainage?
Reports cover inspections and tests across projects, can be saved, and export to CSV or Excel. The road board shows which stretches of each layer are approved, awaiting approval or rejected, and the construction front shows how far each layer has advanced.
Talk to us about your next road.
Whether it is a tender on your desk or a stretch under construction, we will show you the product on work like yours.